Pond Grading

Bentley's Basin.dgnlib

The Basin Civil Cell quickly creates and inside-out bottom and almost always looks good out-of-the box.  The challenge is that it's hard to constrain how much land it grabs.  Basin Civil Cell

 


Outside-In / Top-Down Options

If you have spatial constraints, Outside-In/Top-Down Options may be useful.

Download Pond-Grading.itl

The following templates run along a feature with an active profile (either the terrain elevation for the Limits, or the elevation of the Inside of the Berm for the berms)

Three Pond Templates

 


Timesaving tip: if you're using the ORD Drainage Pond Design (from Terrain): the pond volume can be read once, there is no Update Storage tool.  If you are iterating to need pond size, just change the values in the Pond tables, rather than repeatedly tweak the pond grading.  Once you have a pond that meets hydraulic constraints, then do a final pond grading that matches the hydraulic numbers.